Storage & asset management

Keep booth assets ready between shows

Repeat event programs need more than a one-time ship. We help receive, inspect, store, and refresh booth assets so every next show starts from a known baseline.

See what you get
  • Storage and inventory tracking between events
  • Inspection, repack, and graphics swap planning
  • Refresh planning for teams exhibiting multiple shows per year
Hand-drawn storage shelves with exhibit crates, rolled graphics, and an inventory checklist

What you get

A known inventory and condition baseline between one show and the next

Start with tangible outputs and a clear handoff. We define which deliverables belong in your engagement before the work begins.

An asset and crate record

The agreed booth components, graphics, and crate contents organized into a usable inventory. Keep asset identification connected to the system and the events it supports.

Receiving and condition notes

Available information on what returned and which items need attention. Distinguish a received crate from a checked, complete, and ready-to-use system.

A refresh and repair plan

Replacement graphics, panel changes, hardware repairs, or upgrades identified for review. Set priorities around the next event rather than waiting until outbound packing.

Next-show preparation context

Inventory, approved refresh work, and release requirements connected to the event calendar. Freight and production remain defined services within the wider program.

Ways to work together

Choose the support your team needs

Compare the scope of each approach, including the decisions and inputs your team will own. The proposal confirms the services and responsibilities you choose.

A storage and inventory scope

Agree the assets, receiving process, records, and storage arrangement.

  • Asset and crate identification
  • Agreed receiving checks
  • Inventory baseline
  • Storage and release responsibilities

Your part: Provide an accurate starting inventory and confirm the expected storage period and next use.

An ongoing asset program

Connect storage with condition review, approved refresh work, and the show calendar.

  • Post-event condition context
  • Refresh and replacement planning
  • Next-show asset allocation
  • Release and routing coordination

Your part: Approve repairs and replacements and keep the event calendar current. Production and freight costs are separately identified.

Who it helps

Build the scope around the problem you need to solve

Use Storage & Asset Management where it supports a specific business need. These starting points help us choose the right work and identify the information your team needs to provide.

Hand-drawn condition report, repacked booth crate, and documentation camera
Planning connected work? Explore Post-Show Report
  • Assets return from several events

    Maintain a consistent record of components and condition as the system moves through different venues and crews.

  • You need to reuse a booth confidently

    Check what is available, what needs work, and what must be ordered before committing to the next configuration.

  • Inventory knowledge lives with one person

    Turn informal memory into an agreed record that the project, production, and event teams can use.

  • Older graphics need to be identified

    Separate current materials from outdated or damaged items in the inventory, with clear decisions about what to retain, replace, or retire.

How it works

A clear path from the brief to the next handoff

Follow the work, decisions, and responsibilities at each stage. We agree the actual schedule around your scope, approvals, and the dependencies that affect delivery.

  1. Stage 1

    Set the inventory baseline

    Agree the assets and records covered by the storage scope.

    • Review components and crates
    • Confirm identifiers and contents
    • Record existing condition information
    Your part

    Share the starting inventory, photos, dimensions, and any known missing items.

  2. Stage 2

    Receive and assess

    Connect returned assets to the agreed receiving and condition process.

    • Confirm received items
    • Record relevant condition notes
    • Flag discrepancies for review
    Your part

    Provide outbound and repack context from the show so differences can be investigated.

  3. Stage 3

    Plan the refresh

    Identify work needed for the next use and obtain approval before production.

    • Prioritize repair or replacement
    • Review graphic updates
    • Align work with the next date
    Your part

    Approve priorities, costs, and updated artwork where required.

  4. Stage 4

    Prepare the next release

    Connect the available inventory and approved changes to the next shipment.

    • Confirm allocated assets
    • Review readiness and open items
    • Coordinate release information
    Your part

    Confirm the next event, destination, and the people responsible for receiving and setup.

The stages show the working sequence, not a guaranteed turnaround. Your proposal confirms the included work, review points, and timing. External approvals and separately scoped services can affect the schedule.

Quality and controls

Agree the important checks before work moves forward

Use specific review points to catch gaps and keep the work connected to the approved brief. Each check needs the right information and a person who can make the decision.

Hand-drawn booth drawings, approval checklist, and pencil for reviewing exhibit requirements
Clear asset identity
Use consistent labels and records so components remain recognizable across shows and suppliers.
Known condition
Record the level of inspection performed and any limitations. Do not describe an unchecked item as ready for use.
Approved refresh work
Repair and replacement needs become decisions with costs and timing, not assumed authorizations.
Enough preparation time
Connect release dates to inspection, production, packing, and freight dependencies in the next-show schedule.

The handoff

Give the next person the context to act

Useful work needs a usable handoff. Agree the outputs, supporting information, and ownership so the next stage can move forward with a clear starting point.

Inventory context

The agreed record of assets, crates, contents, and the information available about their condition.

Refresh decisions

Items requiring repair, replacement, or updated graphics, with approval and completion status.

Release requirements

The selected assets, next destination, timing, and outstanding actions before shipment.

The agreement defines storage conditions, receiving checks, inventory detail, access, release arrangements, and commercial terms. Repairs, replacement graphics, freight, and upgrades require separate approval and scope.

Scope and pricing

Know what shapes the quote before you commit

The proposal connects your requirements to deliverables, responsibilities, fees, and terms. Review the initial work, ongoing needs, and connected services together.

Hand-drawn proposal, calculator, and calendar for planning scope, budget, and timing
01
Storage requirements
Asset size, crate volume, duration, handling needs, and the specific arrangement shape the storage quote.
02
Management coverage
Inventory detail, receiving checks, reporting, allocation, and release coordination define the service effort.
03
Additional work
Freight, repairs, replacement graphics, upgrades, repacking, and other production are separately scoped.

Compare the approaches

Storage alone or ongoing asset management?

Space for crates and a program that keeps assets ready are different responsibilities.

What to considerDefined storageManaged asset program
Focus

The agreed storage arrangement and basic receiving or release responsibilities.

Inventory, condition information, refresh decisions, and preparation across events.

Your team

Coordinates excluded checks, updates, repairs, and next-show planning.

Approves priorities and keeps show requirements current while agreed coordination continues.

Next shipment

Needs a separate readiness and routing plan where not included.

Connects to the shared inventory and approved refresh work.

Prepare your brief

Make the first conversation useful

Gather the information that will help us assess the work. Use this checklist to identify what you already have and what we should clarify together.

Topics you have prepared for Storage & Asset Management
Bring what you have, clarify the rest

Mark the topics you have already gathered. Your selections will appear in the enquiry form, where you can add details before continuing. You can start a conversation with any number of items ready.

0 of 6 topics prepared. We can discuss the open items.

This is a planning aid. It does not confirm feasibility, pricing, or a delivery date. Nothing is sent by checking a box.

Frequently asked questions

Storage & Asset Management questions

Find practical answers about getting started, approvals, scope, costs, and what happens after delivery.

8 questions about getting started.

Can you store a booth we already own?

We assess the assets, dimensions, condition, documentation, and storage needs before confirming an arrangement. Share crate details and the expected duration. Availability, handling requirements, and the management scope need agreement before anything is shipped.

Do we need a complete inventory first?

An existing inventory helps establish the baseline. If records are incomplete, we can discuss the work required to identify and document the assets. The scope should make clear what is known, what will be checked, and which items remain uncertain.

Can graphics and hardware be tracked together?

Yes, the inventory can connect the agreed components to their graphic versions and system configuration. Confirm the level of detail required in the asset-management scope. A useful record helps identify which graphics belong to which hardware and whether either needs attention before the next event.

What if assets are spread across several locations?

Start by identifying what is stored where, who controls access, and which records are current. The program can assess allocation and routing, but each location's responsibilities need to be clear. A shared inventory should distinguish verified availability from items that still require confirmation by another owner.

What should we bring to the first conversation?

Start with the information in the preparation checklist: asset inventory and crate details; photos and existing condition notes; storage period and handling requirements; return shipment and repack information; next-show dates and configurations; repair approver and release owner. You do not need a finished specification to discuss the project. Identify what is confirmed, what is still undecided, and any deadline or budget constraint that could change the recommended scope.

Can you work alongside our internal team or another supplier?

Yes, when the responsibilities and handoffs are clear. Identify who supplies information, who implements each part, and who has final approval. We define the work our team owns and the dependencies retained by others. That helps avoid duplicate effort, conflicting instructions, and assumptions about services that no one has agreed to provide.

What if we do not have all the required information yet?

We can use the first discussion to identify the gaps and decide what can be clarified early. Missing facts, access, specifications, or approvals may prevent later work from starting. Bring the materials you have and explain what is uncertain, so preparation can be sequenced around the decisions that matter.

We had a disappointing experience before. What would change?

Start by sharing the previous scope, relevant materials, and what went wrong. We can review whether the issue involved requirements, execution, handoff, or expectations. A new supplier alone is not a guarantee of a better outcome. The useful next step is an agreed brief, clear responsibilities, and review points that address the actual problem.

Program support

Building a repeat show program?

Share your goals, current materials, and timing. We will review the Storage & Asset Management requirements, identify open decisions, and agree a practical scope with your team.

info@exhibitant.com

Tell us what you need

A few details will help us make the most of our conversation.